Daytime Noise Monitoring Results -- Normal weekday
Station M5, Chuk Lam Ming Tong                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
05-Mar-12 14:00 14:30 Fine 62 65 57 Welding and operation of excavator Road traffic noise N.A 21.4 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
15-Mar-12 13:39 14:09 Fine 63 65 59 Rock out Road traffic noise N.A 17.4 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
19-Mar-12 11:12 11:42 Fine 73 75 67 Works inside the noise enclosure Road traffic noise and breaking process in nearby building N.A 20.9 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
27-Mar-12 13:45 14:15 Sunny 63 65 59 Works inside the noise enclosure Road traffic noise and breaking process in nearby building N.A 20.5 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
      Min. 62                
      Max. 73